3 PHYSICAL INSTALLATION
This section of the Manual explains how to install the surface and the sub-sea compo-
nents of the TSS 350 System.
During the installation procedure, you should make a written record of certain param-
eters and retain them with the survey log for reference during the post-processing
operation. The DeepView display software on the SDC allows you to examine the
System parameters and to create a printed copy that you may retain with the survey
records.
There are many different types and size of survey vessel and ROV and it would be
impossible for this Manual to cover all installation possibilities. The instructions in this
section therefore represent a set of general guidelines and recommendations that
experience has proved effective.
IMPORTANT
Note that you cannot regard certain aspects of the 350 installation procedure as
optional: The instructions relating to coil location, orientation and mounting configura-
tion are of critical importance to the successful operation of the 350 System. You must
follow these instructions.
3.1 SDC Installation Page 2
You may use the SDC while it remains mounted in the shock-protecting transit case,
or you may install the SDC in a 19-inch instrument rack. You should install the SDC
where you can see and operate it easily.
3.2 Sub-sea Installation Page 3
The success of any survey performed by the 350 System relies heavily on the care
you exercise when you install its sub-sea components.
3.3 Installation Check List Page 13
This post-installation checklist helps you to avoid some common errors and omis-
sions when you install the 350 System.